Daily Surface Restoration Schedule

Schedule for 5/27/2026

  • 1325 Fallowfield Ave
  • McCaslin St
  • 3955 Boulevard Dr
  • 2332 Wellington St
  • 3137 Josephine St
  • Dengler St and Arlington Ave
  • 2941 Arlington Ave
  • 2943 Arlington Ave
  • 1818 University Ave
  • 2120 Letshe St
  • 60 Olive St
  • 38 Edenvale St
  • Perrysville Ave and Fed St Ext
  • 1714 Warren St
  • 124 Henderson St
  • Sandusky St and Shockoe Way
  • 1633 Compromise St
  • 643 Rising Main Ave
  • 401 Jacksonia St
  • 418 W Jefferson St
  • 1414 Buena Vista St
  • 1501 Buena Vista St
  • 1523 Buena Vista St
  • 1714 McCullough St
  • 1622 Marquis Way
  • California Ave and Marquis Way
  • 1900 Brighton Rd
  • N Charles St and Irwin Ave
  • 162 37th St
  • Grant Ae and Butler St
  • 969 Ornamore St
  • 5077 Rosecrest Dr
  • 5511 Claybourne St
  • 5517 Claybourne St
  • 4308 Woolslayer Way
  • 4202 Penn Ave and Woolslayer Way
  • 358 42nd St
  • 192 45th St

Click Here for the Daily Lead Line and Small Diameter Water Main Replacement Restoration Schedule

Click Here for the Full Season Restoration List by Neighborhood

About Paving and Restoration: Planned and Urgent Restorations

Crews paving roads

Restorations or paving after emergency repairs and planned construction projects do not always take place immediately after work is completed. Restorations are handled differently depending on the type of work we perform and the weather.

Asphalt crews and concrete crews work independently of each other. This means that it is not uncommon to see street paving and sidewalk replacement happening at different times.

In an effort to be as efficient as possible, we organize our projects by neighborhood so contractors do not need to move their materials and equipment across our service area on a daily basis. This reduces our costs and saves our ratepayers money. We appreciate your understanding and patience as we work to perform our work as quickly and responsibly as possible. Please see the restoration schedule above for current restoration location

Types of Restoration

Planned Construction

Street restorations for planned construction projects take place soon after the work is completed. These projects typically occur from spring through fall, when asphalt plants are open and concrete can set properly. 

Emergency Repairs

Water main breaks and sewer failures are common examples of emergency repairs. These unplanned events require that we dig into roadways and sidewalks. Sometimes this work occurs during the winter months, when asphalt plants are closed and temperatures are too low for larger areas of concrete and other materials to set properly.  After an emergency repair is made, the street and/or sidewalk will be either temporarily or permanently restored, depending on the time of year. We cannot provide permanent pavement restorations until temperatures are warmer in the spring through fall. 

Final Restoration

Completed in the warmer months, in spring through fall. Due to the high number of restoration sites, in part because of our aggressive lead service line replacement program, it may take several weeks before sites are restored permanently. Please note that the work is weather-dependent and subject to change.