Lead Line Replacement Programs

Burham lslr

We will complete targeted lead service lines replacements with a prioritization model that removes lead in drinking water for our most vulnerable populations. 

Lead Service Line Replacement Approaches

Neighborhood Lead Line Replacement Projects: We target all lead lines in a geographic space, passing over non-lead service lines. When a private service line is made of lead, we will work with the property owner to replace the line at no direct cost.

Water Main + Lead Service Line Replacement: This annual program targets aging water mains that also show high concentrations of lead lines attached. You can read more about this program on our Water Construction Projects page.

We have also replaced lead lines at all daycare facilities within our water service area as part of our Priority Lead Line Replacement program in 2022.

To view all lead line replacement work and see what your service line is made of, visit our Lead Map.

What to Expect During a Lead Service Line Replacement

How is a service line replaced?

Typical service line layout

Crews will start the process by going to each property and inspecting the service line material at every property. This will help determine which sites have lead service lines that need replaced. 

If both a private and public lead service line is found at a property, the Lead Help Desk will reach out and set a coordination meeting with the property owner to discuss the replacement methods and schedule a replacement date. If a customer has a public lead service line, it will be replaced at no cost and no coordinate meeting is needed.

The next step of the process is to replace the lead service line with a non-lead material. We request that the property owner or a designated representative be present on this day. We will provide a lead pitcher filter and cartridges, as well as flushing instructions, after replacement. 

The final step of the project is restoration of streets and sidewalks. You can expect a delay between the completion of your service line replacement and restoration activities.

Daily Schedule for Lead Line and Small Diameter Water Main Replacement Projects

May 27, 2026

 

Small Diameter Water Main Replacements

Elliot and Crafton Heights

  • Bucyrus St 
  • Marlow St 
  • Valonia St 
  • Chartiers Ave (inspections)

Bloomfield

  • 420 block Fisk St 
  • Fisk St and Mintwood St 
  • Friendship Ave 
  • Sapling Way 
  • Liberty Ave (inspections)

Squirrel Hill

  • Tech St 
  • Beeler St and Wilkins Ave (restoration)
  • Murdoch Rd (restoration)
  • Wilkins Ave and Dunmoyle St (restoration) 

Neighborhood Lead Line Replacements

Upper Hill

  • 3300 block Ajax St 
  • 830 block Anaheim St
  • 700, 800, and 4200 blocks Byrn Mawr Rd
  • 3400 and 3600 blocks Ridgeway St  
  • Cherokee St (restoration)
  • Iowa St (restoration)

Homewood North

  • 7200 block Kedron St – private 
  • 7200 block Hermitage St (inspections)

Oakland

  • Niagara St (restoration)
  • Ophelia St (restoration)
  • Ward St (restoration) (inspections)

South Side Slopes

  • 2200 block Arlington Ave 
  • 2100 block Eccles St 
  • 2100 block Salisbury St 
  • 2000 and 2100 blocks Arlington Ave (inspections) 
  • Salisbury St (inspections)

Marshall Shadeland

  • 1200 block Hodgkiss St 
  • 1100 block Ingham St
  • 2500 block Stayton St 
  • 2400 block Toner St 

Squirrel Hill

  • Beacon St (restoration)

Greenfield

  • 3800 and 3900 blocks Nantasket St
  • 4000 block Hoosac St (inspections)

Polish Hill

  • 330 block Downing St 
  • 2900 block Leander St 
  • Flavian St (restoration)
  • Herron Ave (restoration)
  • Melwood Ave (restoration)

Point Breeze

  • 6900 and 7100 blocks Edgerton Ave 
  • 300 block Le Roi Rd 
  • Lloyd St (inspections) 

 

Upcoming Lead Line Replacement Neighborhoods

In the next few months or so, we will begin lead service line replacements in portions of the following neighborhoods:

  • Homewood North
  • Homewood South
  • Lincoln-Lemington-Belmar
  • Garfield
  • Friendship
Questions?

For lead service line replacement questions, contact the Lead Help Desk at 412-255-8987 or email LeadHelp@pgh2o.com