We will complete targeted lead service lines replacements with a prioritization model that removes lead in drinking water for our most vulnerable populations.
Lead Service Line Replacement Approaches
Neighborhood Lead Line Replacement Projects: We target all lead lines in a geographic space, passing over non-lead service lines. When a private service line is made of lead, we will work with the property owner to replace the line at no direct cost.
Water main + lead service line replacement: This annual program targets aging water mains that also show high concentrations of lead lines attached. You can read more about this program on our Water Main Replacement Program page.
We have also replaced lead lines at all daycare facilities within our water service area as part of our Priority Lead Line Replacement program in 2022.
Lead Line Map
The map below displays the best available information on the location of lead service lines in our water system. The information on the map comes from a combination of historical property data, construction records and results from curb box inspections. The map also shows where we have already replaced lead lines and where we plan to replace lead lines.
Instructions on how to use the map below.
See a full-size version of the lead map.
The portion of the water service line that is public and owned by us runs from the water main in the street to the “curb box” (water service shutoff valves, usually located in the sidewalk between the water main and the building). The remainder of the line that connects from the curb stop to the building is considered private property.
Disclaimer: The maps provided by the Pittsburgh Water are based on historical data, service line inspections or both. Pittsburgh Water does not guarantee the accuracy of these records and maps, which shall be used for the sole purpose of providing property owners and residents with the best available data regarding lead service lines, and not for any commercial, legal or other use. These records will be updated as we gather additional information. We reserve the right to alter, amend or terminate at any time the display of these maps and records. If you think the information we have for your service line is incorrect, please fill our our brief survey.
How is a service line replaced?
A typical service line
Crews will start the process by going to each property and inspecting the service line material at every property. This will help determine which sites have lead service lines that need replaced.
If both a private and public lead service line is found at a property, the Lead Help Desk will reach out and set a coordination meeting with the property owner to discuss the replacement methods and schedule a replacement date. If a customer has a public lead service line, it will be replaced at no cost and no coordinate meeting is needed.
The next step of the process is to replace the lead service line with a non-lead material. We request that the property owner or a designated representative be present on this day. We will provide a lead pitcher filter and cartridges, as well as flushing instructions, after replacement.
The final step of the project is restoration of streets and sidewalks. You can expect a delay between the completion of your service line replacement and restoration activities.
What to expect during a lead service line replacement
Daily Schedule
November 17, 2025
Brighton Heights
- 3543 California Ave
- 3547 California Ave
- 3460 Gass Ave
- 3400 Shadeland Ave
- 3406 Shadeland Ave
- 3410 Shadeland Ave
- 3512 Shadeland Ave
- 3516 Shadeland Ave
- 3534 Shadeland Ave
- 3538 Shadeland Ave
- Davis Ave and Fleming Ave
- Hybla St
- Restoration throughout work area
Lower Lawrenceville
- 34th St and Ligonier St
Squirrel Hill
- 5249 Fair Oaks St
- 5251 Fair Oaks St
- 5255 Fair Oaks St
- 5259 Fair Oaks St
- 5301 Fair Oaks St
- 1218 Squirrel Hill Ave
- 1224 Squirrel Hill Ave
- 1230 Squirrel Hill Ave
- 6428 Darlington Rd
- Wilkins Ave
- Darlington Rd (inspections)
- Restoration throughout work area
Hazelwood
- 109 Bigelow St
- 4617 Chatsworth St
- 520 Emahlea St
- 4520 Monongahela St
- 4529 Monongahela St
- 4601 Monongahela St
- 4603 Monongahela St
- 4542 Parnell St
- 463 Winterburn Ave
- Restoration throughout work area
Oakland
- 3233 Parkview Ave
- Dawson St (inspections)
Mount Washington
- Restoration throughout work area
Point Breeze
- Restoration throughout work area
West Oakland
- Restoration throughout work area
Central Oakland
- Restoration throughout work area
Current Lead Line Replacement Neighborhoods
Mount Washington
215 locations will be inspected and where lead is found, it will be replaced at no cost to the customer
Manchester
195 locations will be inspected and where lead is found, it will be replaced at no cost to the customer
Perry North
375 locations will be inspected and where lead is found, it will be replaced at no cost to the customer
Millvale
801 locations will be inspected and where lead is found, it will be replaced at no cost to the customer
California-Kirkbride
23 locations will be inspected and where lead is found, it will be replaced at no cost to the customer
Spring Garden
49 locations will be inspected and where lead is found, it will be replaced at no cost to the customer
East Liberty
129 locations will be inspected and where lead is found, it will be replaced at no cost to the customer
Hazelwood
278 locations will be inspected and where lead is found, it will be replaced at no cost to the customer
Oakland
589 locations will be inspected and where lead is found, it will be replaced at no cost to the customer
West Oakland
200 locations will be inspected and where lead is found, it will be replaced at no cost to the customer
Squirrel Hill South
508 locations will be inspected and where lead is found, it will be replaced at no cost to the customer
Upcoming Lead Line Replacement Neighborhoods
In the next few months or so, we will begin lead service line replacements in portions of the following neighborhoods:
- Homewood North
- Homewood South
- Lincoln-Lemington Belmar
- Garfield
- Central Northside
- Marshall Shadeland
As work progresses, more neighborhoods will be announced. To view all lead line replacement work and see what your service line is made of, visit our Lead Map.
Questions?
For lead service line replacement questions, contact the Lead Help Desk at 412-255-8987 or email LeadHelp@pgh2o.com.